Gillaroo
Home
Plans and crew
Past crew
The Build
2003
Design
Model
Workshop & Table
Infusion
2004
Assembling hulls
2005
Hull Bulkheads
Bridgedeck Floor
Superstructure
2006
Completing Shell
Interior
2007
Painting
Interior
Exterior
2008
Completion
Time and Materials
Links and Suppliers
Launch
First time
Relaunch
Equipment issues
Hardware
Modifications

Cruising
2008
Ireland
N.Spain
Portugal & Tarifa
Canaries
2009
St Vincent & Grenadines
Trinidad & Tobago
Dutch Antilles
Panama 1 P 2 P 3 P 4 P 5
Galapagos 1 G 2
Marquesas 1 M 2
Tuomotos
Societies 1 S 2
Cooks 1 C 2
Niue
Tonga 1 T 2
2010
New Zealand NZ2 NZ3 NZ4
Fiji 1  Fiji 2  Fiji 3
Vanuatu 1
wpa9f08a11.png
wp215248f6.png
wpb75cdac0.png
wpbbae949a.png
wpb223906d.png
wp174697f0.png
wp26164ddd.png
wpb28f2814.png
wp5064ee2b.png
wp4157e354.png
wp3c554107.png
wpde2bcfdd.png
wp3fdef499.png
Workshop and Table
Finding a suitable workshop in N. Ireland was not easy. With a 23 ft. beam she was going to be too wide for most of the local roads. The options were to build in sections, find a shed by the water or create my own space. In the end I went for the third option and rented a small holiday cottage on the shores of Strangford Loch with the use of a patch of a field on which to erect a polytunnel.
It was easy enough to find a second hand mushroom polytunnel and it took just a couple of weeks to erect. Am finding it satisfactory to work in but not ideal. The uneven floor makes it difficult to measure some jobs accurately and also for shifting heavy items around. It gets hot in sunshine (have put up a nylon sunscreen on the roof) and cools quickly. And it blew away over my first winter. But for a one-off project it is working well enough. Have found that for resin work my limit is about 8 months of the year - winter is just too cold and too much humidity.

The next job was to build a table for the panels. Kelsall designs are build by making flat full size panels on a worktop and then bending them to shape by appropriate use of grooves/dart cuts and the reduced fibreglass in areas where there are greater curves. Each panel is a sandwich of gel coat, glass, foam and glass. The table needs to have a perfect surface, waxed so it will release the gel coat. Building the 50ft x 8ft table was easy enough, the surface was more problematic. I surfaced it with Formica and got a kitchen fitter in to help me with the job. The usual method is to use contact adhesive to glue down the Formica but unfortunately we used PVA instead and over the coming months, particularly the winter, the Formica bubbled up and delaminated.  However at the time it appeared satisfactory.

The next job was to do some tests and infuse the first panel. Was using resin infusion to wet out the fibreglass (more on this on the next page), the method is to roll out a layer of gel coat, then lay on the glass/foam/glass dry. The whole thing is then vacuum bagged and the resin drawn through using a vacuum. After some trial and error got my infusion process working and infused the first panel. All seemed to go well and with much relief I closed up shop for the day. However all was not well, there had been a leak through the table and a large section of the bottom of the panel had not been infused. The cause of the problem was the joins in the Formica, I had filled the cracks with plasticene and taped over with packing tape. Unfortunately the resin had reacted with the tape and lifted it, allowing air to get in - a problem that had not occured on any of my test pannels. It was to be another 8 months and £1200 in materials before I successfully infused a panel, in the end I resurfaced the table using  beta boards (used by construction builders for